
Add to Cart
Wall Panel / Roofing Corrugated Sheet Roll Forming Machine 23 Forming Group
1. Number of forming groups: 23 group
2. The machine material: welding comprise of 300 double T-steel
3. The wallboard: processing compose of 20mm steel plate
4. The mold: The mold is made of 45#steel, processed after rough turning, finish turning, finish grinding, hard chrome
plating to ensure that the mold no deformation, glabrous, wearable and accurate.
5. The shaft: The shaft is made of 45#steel, diameter of 62mm, finish turning, finish grinding after heat treatment,
quenching and high temperature tempering.
6. The bearing: Harbin type 6208
7. The roll material: 0.3-0.5mm color steel sheet, galvanized steel sheet, aluminium sheet, expansion material 1000mm,
ejection of compact effective area is 840/900. It also can be customized according to customer's size.
8. Motor:3kw * 1 set (380v)
9. Transmission: 1.0 inch chain
10. Discharge rack: 1 set
11. Machine feature: PLC NC frequency electrical boxes, touch screen`s display, the encoder counting,
the length and quantity of the material is controllable, accuracy with in 1.0mm, automatic hydraulic cut.
12. Machine Length: 5.6 m * 1.5 m * 1.5 m
13. Machine Weight: 4.8 tons
14. Production time: 20 days
15. One year warranty
After Sale Service
A. Foreign debugging
We will arrange our professional engineers to help you install and debug the machines well. Buyer should pay $100for each engineer every day and should be responsible for transportation (including round-trip ticket), insurance, and suitable accommodation.
B. Guarantee period
1. The warranty will be maintenance, maintain in the guarantee period of 18 months starting from delivery. Because of the quality of equipment during guarantee period, we will provide the parts free of charges, which is in the conditions of correct operation. (Natural disasters or factors which can’t forced by human are excluded).
2. If the equipment are out of work in the guarantee period, the buyer needs our repairman to come to buyer’s factory, the buyer should be responsible for the tickets(including round-trip ticket), the fee of transportation to the buyer’s factory andaccommodation. Required to change spare parts, the buyer should afford the freight fee and we don’t ask extra fee.
C. Training
During installation and adjustment of the equipment, our engineers shall provide the training to
buyer’s personnel request to operate and maintain the equipment.
Including foundation construction, electrical works, hydraulic oil, safe operation and non-standard safety items, testing material and etc.
D. Lifetime services
Lifetime services to every customer.