
Add to Cart
4M Run Out Table Downspout Roll Forming Machine For Wall Cladding Contruction Material
1. The advantage
gutter cold roll forming machine can bend the roll formed pipe, and let the drainpipe and the bending connect to be the whole.The product after roll forming has long working time than the tranditional ppc pipe, and not aging. It can make the project more integrate, and help to enhance the image of the all project.
2. Main Accessories of the roll forming machine
1 | Decoiler(manual or hydraulic for options) | 1 set |
2 | Feeding device | 1 set |
3 | Main Forming Machine | 1 set |
4 | Hydraulic cutting device | 1 set |
5 | Hydraulic Station | 1 set |
6 | PLC computer control system | 1 set |
7 | 4m Run Out Table | 1 set |
3. Work flow:
manual uncoiler-- roll forming machine-- PLC control box-- hydraulic system-- post cut-- output table
Article No. | Item Name | Specification |
1 | Width of feeding material | 1000mm coil sheet |
2 | Thickness of feeding material | 0.3mm-0.8mm coil sheet |
3 | Roller station | 2-15 stations |
4 | Shaft Diameter | 75-95mm |
5 | Productivity | 8-12m/min |
6 | Rollers' material | 45# steel forge |
7 | Shaft material | 45# steel |
8 | Weight | 2.5-8 ton |
9 | length | 5.5 m-11m |
10 | Voltage | 380V 50Hz 3phases |
11 | Control | PLC |
12 | Decoiler | 8 Tons |
13 | Motor | 3kw-15kw |
14 | Driving way | Chain transmission |
15 | Chain size | 0.6 inch-2 inch |
16 | Cutting system | Hydraulic cutter |
4. Warranty, Year warranty.
During the warranty period, maintain and change the spare parts for the customers for free (except for the instrument damage caused by human factors or natural disasters. ) And provide technical support for life-long.
We can design and manufacture the machine according to clients' request! Our machines have passed CE, Guaranteed quality. Please send us the enquiry with Profile Drawing.
5. After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)